|
Are you Building the Patrol?
If you are, this section of this web site is for you.
Patrol fuselage tubing UPDATE
To: Bearhawk Patrol Builders
Re: Profiled Tubing Kit: Bearhawk Patrol Fuselage
VR3 Engineering is ready to supply a kit of profiled tubing ready for tack
welding for the Bearhawk Patrol fuselage per the R&B Aircraft design.
A kit of tubes for the fuselage is a total of 117 profiled tubes plus 6 straight cut longeron tubes.
Approx 306 linear feet of tubing.
Estimated weight is 94 lbs
Material Spec: 4130N aircraft quality tubing
Profile and length tolerances approximately +/- .005*
Maximum length of tubes is 51* long excluding above 6 longeron tubes
Kit includes a 3D weld assembly drawing complete with itemized bill of material.
All tubes are labelled with corresponding part no. and material dimensions.
All tubes are supplied as straight pieces, bending as required to be performed by the builder
Contact: Don VanRaay or Menno Peters
VR3 Engineering
65 Cherry St.
Statford, Ontario, Canada N5A 2E9
Ph#519-273-6660 Fax#519-271-6888
Website: www.vr3.ca Email: dvanraay@vr3.ca
|